Pick the date, submit a week early, and set the version to release manually. Then work back four weeks, with one gate per week. If a gate isn't true when you reach it, move the date once and say so. After launch day, the real work starts: finding out who signed up, who stayed, and why.

## The short version

- Pick a Tuesday, Wednesday or Thursday, and submit at least a week before it with manual release on.
- If you ship on Android with a new personal Play account, start the closed test now. It takes at least 14 days.
- Each week has a gate: a sentence, then the hero screen, then real files at Apple's sizes, then a build waiting for you.
- Launch day is a spike. Track one number before it, and plan the two weeks after it.

## Four weeks out: the date, the sentence, the rules

No pixels yet. This week is about a date, one sentence, and a true picture of what the stores will ask for.

**Say the date to someone who will remember it.** A Tuesday, Wednesday or Thursday, unless you have a reason. Check it against a bank holiday or a big event in your space.

**Choose manual release.** On [Apple's release options page](https://developer.apple.com/help/app-store-connect/manage-your-apps-availability/select-an-app-store-version-release-option), you can release the version yourself, release it automatically after approval, or release it automatically but no earlier than a date you set. Pick manual, so approval means "waiting" and not "live while you were asleep."

**Leave a week between submitting and the day.** Review is often faster. Often is not a plan.

**Start the Android wait now.** Google's [testing requirements page](https://support.google.com/googleplay/android-developer/answer/14151465) says personal developer accounts created after 13 November 2023 must run a closed test with at least 12 testers, opted in for at least 14 days in a row, before they can apply for production access. Google says review of that application usually takes 7 days or less. That is longer than four weeks feels, so start it first.

**Use the app like a stranger.** Delete it, reinstall it, and sign up with a new email. Go through onboarding without skipping anything, and write down every moment you hesitate. That list is your polish list for week two.

**Write the one sentence.** What the app does and who it's for, in words a stranger can repeat. If the team can't agree on it, the screenshots, the page and the videos will each invent their own. The [one-line landing page post](https://ignura.com/blog/landing-page-one-line) shows how to write it.

**Pick two or three channels, each with an owner.** The App Store page, plus Product Hunt, X, creator videos, or a list you already have. A channel you can't feed every day is better dropped now. If Product Hunt is one of them, open a personal account today. [Product Hunt's own guide](https://www.producthunt.com/launch/before-launch) says new accounts wait a week before they can post. The rest of its rules are in [the Product Hunt checklist](https://ignura.com/blog/product-hunt-launch).

**Decide iPhone only, or iPhone and iPad.** That choice changes which screenshots Apple requires. Write it down before anyone exports a frame.

**Pick the number you'll watch.** Launch traffic means nothing if you can't see sign-ups and the first real action by channel. Set up tracking now, while it's calm. [PostHog's free tier](https://posthog.com/pricing) includes 1 million analytics events a month. Our guide to [early-stage startup metrics](https://ignura.com/blog/early-stage-startup-metrics) covers what to track first.

**Book people now.** Creators, an editor, anyone filming the app. They need lead time, and week three is too late to start asking.

*Margin note: A date, a sentence, manual release.*

## Three weeks out: the hero screen

The goal this week is one screen that makes a stranger think "oh, nice", and a clear plan for the files Apple needs.

**Find the hero moment.** Most apps have one screen where the point lands: a card flipping over, a map filling in, a photo turning into something. That screen leads the [first screenshot](https://ignura.com/blog/app-store-screenshot-sizes), any preview, and the top of your page. If you have three candidates, you haven't chosen yet. If the moment is buried three screens deep, moving it forward is the most useful product job you have.

**Know Apple's screenshot rule.** [Apple's spec page](https://developer.apple.com/help/app-store-connect/reference/app-information/screenshot-specifications/) says you must include at least one screenshot and can upload up to 10 per size, as .jpeg, .jpg or .png, with no transparency. For an iPhone app, the required shot is iPhone with Dynamic Island on the medium display. The portrait sizes on that row are 1179 × 2556 and 1206 × 2622. If the app runs on iPad, you also need at least one 13-inch iPad screenshot. Our [screenshot sizer](https://ignura.com/tools/screenshot-sizer) checks a file against these sizes before you upload.

**iPhone Duo is coming, but not yet.** The same spec page says that starting in April 2027, Duo screenshots will be required for any app using the iOS 27.1 SDK or later. Until that applies to your build, the Dynamic Island shot is the one you need.

**The preview is optional.** If you make one, decide now so it's recorded in the real build. [Apple's preview spec](https://developer.apple.com/help/app-store-connect/reference/app-information/app-preview-specifications) says it runs 15 to 30 seconds, and the current iPhone file is 886 × 1920 portrait or 1920 × 886 landscape. That is not the screenshot size. The rest is in [the preview specs post](https://ignura.com/blog/app-store-preview-video-specs-2026).

By the end of the week:

- [ ] The one sentence is something a stranger can repeat
- [ ] The hero moment is one specific screen, with believable content in it
- [ ] Anyone who will record the app has a TestFlight invite or a promo code
- [ ] You've chosen screenshots only, or screenshots plus a preview
- [ ] Tracking shows a test sign-up, tagged by where it came from

## Two weeks out: real files, and the first minute

The files can be rough. They can't be theoretical.

**Polish the first minute.** You don't need a redesign. Fix onboarding and the three to five screens people see first. Cut every step you can, ask for permissions only when they make sense, and get people to the hero moment fast. If you can only fix one thing, fix the empty states. An app with nothing in it looks broken. If people sign up and then stop, that's an [activation problem](https://ignura.com/blog/how-to-improve-activation-rate), and it's worth more than any launch post.

| Asset | Done means |
|---|---|
| Screenshots | At least frame 1, at the required iPhone size, jpeg or png, no transparency |
| iPad, if you support it | A 13-inch screenshot is planned, not a surprise |
| Store words | Subtitle and the first lines of the description exist and agree with frame 1. The rules are in [the listing copy post](https://ignura.com/blog/app-store-listing-copy) |
| Preview, if you're making one | A rough cut of the real app, 15 to 30 seconds, same orientation as the screenshots |
| Landing page | A URL you can send, with the sentence, the hero moment and one action. Our post on [the landing page line](https://ignura.com/blog/landing-page-one-line) covers what that page has to do |
| Creator videos, if you use them | Briefs out, a shoot date before launch week, and more hooks than you think you need |
| Support | An inbox a human will read |

**Only use proof you have.** "Join 10,000 users" on day zero fools nobody.

**Run the two-second test.** Put whatever cut you have through the [stop-scrolling test](https://ignura.com/blog/launch-film-examples): two seconds, sound off, on a phone. Changing an opening is cheap now and painful the night before.

> **Tip: Record as you go**
>
> Each time a screen is finished, record the hero moment on a real device with a tidy status bar. You'll need those clips for videos and the preview, and re-recording late is how dates slip.

## One week out: the build is waiting

The build you mean is in review, or approved and waiting for you to release it. The listing you mean is the one in App Store Connect.

- [ ] "Manually release this version" is the option saved on the version
- [ ] The screenshots in the listing are the required size, not an export you meant to replace
- [ ] If there's a preview, the poster frame is the hero moment. Apple says preview processing can take up to 24 hours after upload, so don't leave it for the morning
- [ ] The store link you'll post is written down and opened on a phone that isn't yours
- [ ] Every post for the day is drafted word for word
- [ ] The [run sheet](https://ignura.com/blog/product-hunt-launch#launch-day-hour-by-hour) has a name on every hour that matters
- [ ] Nobody is "just quickly" adding a feature

A new build restarts the wait. A new headline in launch week usually means the sentence was never agreed.

After you press Release This Version, [Apple says](https://developer.apple.com/help/app-store-connect/manage-your-apps-availability/select-an-app-store-version-release-option) it can take up to 24 hours to appear on the App Store. Put that window on the morning of launch. Apple also emails you if a version sits in Pending Developer Release for more than 30 days.

> **Careful: The night before is a bedtime**
>
> No new screenshots, no new headline, no refactor. If you're still building, you're in an earlier week with less time. Move the date.

## Launch week, day by day

**Monday.** Check the build is approved and waiting, with the final screenshots, preview and copy attached. Get the landing page ready to switch to "we're live".

**Tuesday.** If you're on Product Hunt, draft and schedule the page: tagline, gallery and maker comment. Write the list of people you'll message yourself on the day. A short note to each person, saying why you thought of them, beats a mass DM.

**Wednesday.** Do a full run-through of the run sheet with everyone who has a job.

**Launch day.** Release the app first thing, check the store link from a phone that isn't yours, then follow the run sheet. Reply to everyone, all day.

**The day after.** Thank people. Write down what you'd change while you still remember. Re-cut the creator video that did best with a different opening.

## After launch: the two weeks that matter

Launch day is a spike, not a plan. People who saw you once need to see you again before they install, and the people who did install need a reason to come back. Keep posting on a schedule, reply to every review, and fix the thing everyone mentioned.

Then look at the number you picked in week one. Two weeks after launch, sort what you did:

| Call | When | What to do |
|---|---|---|
| **Keep** | It brought sign-ups who did the first real action | Do more of it, on a schedule |
| **Shrink** | It brought attention but few sign-ups | Keep one version running, change the opening or the page it lands on |
| **Cut** | It took time and the number didn't move | Stop, and write down why you think it failed |

If the launch brought people and they didn't stay, the problem isn't reach. It's activation, and that's where the next month of work should go.

## If a week slips

Move the date once. Tell the people you promised, the same day, with the new date. Pick a day that clears the gate you failed. "Next Thursday" is only a plan if review, the shoot or the preview processing can finish before it.

If the date can't move, here's what to keep and what to cut with only two weeks:

| Call | What | Why |
|---|---|---|
| **Keep** | Frame 1 at the required size | It's on the store page whether you like it or not |
| **Keep** | A one-page landing page | Somewhere to send people that isn't a TestFlight link |
| **Keep** | Manual release and a link check | The cheapest items on the list, and the ones people skip |
| **Keep** | Tracking on sign-ups | Without it, you won't know what the launch did |
| **Shrink** | Creator videos | Five videos with different openings is enough to learn from |
| **Shrink** | Channels | One main channel and one backup |
| **Cut** | Deep polish | Fix onboarding bugs and empty states only |
| **Cut** | Product Hunt, unless you already have people there | It's a lot of work to do half-heartedly |

## FAQ

### How far ahead should I submit to the App Store?

At least a week before the day you want to be live, with manual release on. After you release an approved version, Apple says it can take up to 24 hours to appear.

### Which screenshot does Apple require?

At least one, up to ten, jpeg or png, no transparency. For iPhone, the Dynamic Island medium display. For iPad, if you support it, a 13-inch shot. [Apple's spec page](https://developer.apple.com/help/app-store-connect/reference/app-information/screenshot-specifications/) is the source, and it changes.

### How long does Google Play take for a new account?

For personal accounts created after 13 November 2023, Google requires a closed test with at least 12 testers for at least 14 days in a row, then a production access review that usually takes 7 days or less. Start it four weeks out.

### Do I need an App Store preview video?

No. If you make one, it runs 15 to 30 seconds and the current iPhone file is 886 × 1920 or 1920 × 886. If you're making a launch video beyond the App Store preview, [this founder's playbook for product launch videos](https://www.flowjam.com/blog/product-launch-videos-2026-founders-playbook) covers formats and realistic budgets.

### What should I do the week after launch?

Keep posting, reply to every review, and watch one number: sign-ups who do the first real action, by channel. Keep what moved it and cut what didn't.

## After launch, can people find you?

Ignura is an AI-native agency that automates your GEO and SEO. You approve what goes out. After launch day, search is the channel that keeps working when the posts stop. We work on the pages people and AI assistants find when they look for a product like yours: [AI search](https://ignura.com/ai-search), [technical SEO](https://ignura.com/technical-seo) and [content](https://ignura.com/content). Plans are on the [pricing page](https://ignura.com/pricing).

[Book your free Growth Check](https://ignura.com/book?utm_source=site&utm_medium=blog&utm_content=app-launch-checklist)

Book a 15-minute call about your website: https://ignura.com/book